Process · 7 stages

Transparent stages.

At every stage you know three things: what is happening now, what it costs and when it ends. Below is the whole route from the first call to the warranty period — what the team does, what you do, and which document you receive at the end.

7
Stages to handover
Photo report per week
±3%
Budget variance
2
Year warranty
01 TIMELINE
01
1–3 days

Call and survey

Free

On the first call we ask five questions: building type, area, address, desired dates and budget envelope. Then we visit — measuring with a laser level and taking photographs.

We do
Measured survey and photographic record
A check on structural condition
A reality check on the budget
You do
Show us the property
Tell us your target dates and budget
You receive
Measured survey drawing
Preliminary budget envelope
02
3–7 days

The brief

Free

We write one document that fixes everything: which room is for what, how many people live there, what style, and what you do not want. That document is what protects us both later.

We do
Drafting the brief
Choosing references together
A programme of stages and dates
You do
Fill in the questionnaire
Approve the brief
You receive
The brief
The programme
03
2–6 weeks

Concept and visualisation

20% deposit

We produce two or three layout options and settle on one. Then comes visualisation — you see the space before work begins, while a change still costs nothing.

We do
Layout options
Mood boards and materials
3D visualisation of the key spaces
You do
Choose an option
Give your comments in one round
You receive
The approved layout
3D views
04
3–8 weeks

Working drawings and cost estimate

By stage

Drawings, details, specifications and a line-by-line estimate. After this stage the price sits within ±3% and is fixed by contract.

We do
The working drawing package
Services layouts
A line-by-line cost estimate
You do
Approve the material specification
Sign the contract
You receive
Drawing package
Cost estimate
Contract
05
2–18 months

Construction and control

To schedule

The works run to programme. Every Friday you receive a photo report: what was completed, what was spent, and next week's plan. Concealed work is recorded by certificate.

We do
Carrying out the works with our crews
Material supply and storage
Designer supervision and certificates
You do
Sign off each stage
Pay to the schedule
You receive
Weekly photo report
Certificates for concealed works
06
1–2 weeks

Handover

Final 15%

We draw up a snagging list and clear every item before handover, not after. The final payment falls due only when the list is clean.

We do
Commissioning and balancing the systems
Clearing the snagging list
Cleaning the property
You do
Walk the list with us
Receive the keys
You receive
Handover certificate
Operating instructions for the systems
07
2 years

Warranty

Free

The warranty on the works runs two years. One call and we come back. For building services we bring in the same fitters who installed them.

We do
Call-outs under warranty
Servicing the systems in the first year
You do
Call us when you need to
You receive
Warranty certificate
Material data sheets
02 RULES

Rules we do not bend

These are contract terms, not promises made over the phone.

R1

One contract

All three disciplines in one document. There is no "that was not our crew".

R2

Open-book estimate

You see every line with its material brand and price. The mark-up is agreed in advance.

R3

Friday photo report

A weekly report: what was done, what was spent, next week's plan.

R4

Changes in writing only

Every change is recorded with its price and programme impact — then it is carried out.

R5

Concealed work by certificate

Whatever disappears behind a wall is photographed and certified before it is closed up.

R6

Two-year warranty

Two years on the works. On materials, the manufacturer's warranty, with the paperwork.

03 FAQ

Frequently asked questions

Can I commission the design alone?

Yes. We produce the full documentation and you build with the crew of your choice. If you wish, we stay on as supervisor — the design fee plus 6%.

What happens if the budget moves?

+

The estimate is an appendix to the contract. Any change happens only with your written approval — we cost it, show you, and only then carry it out.

What are the consequences of a delay?

+

The contract sets liquidated damages per day of delay. The only exceptions are client-side delays and force majeure.

Can I manage it remotely, from another country?

+

Yes — a third of our clients do. Weekly photo reports, live video from site and an open budget file, with signatures handled remotely.

Do you buy the materials or do we?

+

Either works. With our supply you get a delivery guarantee and our trade discounts; buying yourself gives you full control. A mixed approach is common too.

Is designer supervision mandatory?

+

Technically no, practically yes. Without supervision we cannot warrant that the work as built matches the design.

Let us start with stage one

The survey and consultation are free — the next step is yours to decide.